UNDER the supervision of the Chin State Rehabil­itation and Reconstruc­tion Committee, 400-volt electricity lines are being reinstalled along Thitsa Road in Falam Township.

About seven miles of the township’s 26 miles long 400-volt power lines were previously damaged during terror attacks.

Deputy Minister for Border Affairs Maj-Gen Kyaw Swa Oo and officials inspected the rerouting of the electricity lines to facilitate the resumption of power distribution through the main power line and a small hydro­power plant.

The deputy minis­ter also inspected the renovation and repair of government staff hous­ing and offices in Falam Township.

Rehabilitation and re­construction work is also underway in Tiddim and Tonzang townships. In Tiddim, construction ma­terials, school furniture and textbooks supplied by the State were handed over for the renovation of Htanywet Village Basic Education Middle School. In Tonzang, the deputy minister and members of the Township Rehabilita­tion and Reconstruction Committee inspected renovation work at the Township Road Depart­ment’s guesthouse, Youth Training School office and Basic Education High School. — MNA/MKKS